Application concept • sector-specific integration
The completed model and reported TRL 5 relate to the underlying T-wire technology. This does not mean that every application described has been tested. Sector-specific integration is a further development step.
Cleaning and grounds maintenance
Mowers, washers and mobile cleaners can follow repeatable routes along farm infrastructure. The power supply is designed to suit the layout and operating method.
Work organisation
Line power may reduce charging interruptions. Water supply, equipment handling and maintenance still affect operational continuity.
Farm integration
On-site generation could be used with an appropriate supply and protection system. The route should not interfere with panel operation or maintenance access.
What the pilot should verify
Row layout, uneven terrain, water, contamination, power demand and maintenance access.
Scope, target parameters and acceptance criteria are agreed for a specific installation before testing.
Discuss your application
Tell us about the equipment, route length, power demand and operating environment. These details form the basis for a technical discussion.
Contact the team ↗